Main content
City of Alexandria Homepage
Sunday, July 5  •  75°Mostly Cloudy Air Quality: Yellow
CloseWeather Forecast
Today: High 85° Low 69°
Mostly CloudyAir Quality: Yellow
Mon: High 82° Low 69°
Scattered ThunderstormsAir Quality: Yellow
Tue: High 91° Low 72°
SunnyAir Quality: Yellow
Wed: High 88° Low 69°
Scattered Thunderstorms
Thu: High 86° Low 70°
Partly Cloudy
City of Alexandria, VA City of Alexandria, VA
Code Administration
Share Share RSS RSS Print Print Text Size Text Size NormalText Size LargeText Size Extra Large
Page updated Jan 13, 2011 2:29 PM
CloseComments

No Comments Posted Yet

Permit Requirements for Residential Additions

****The following content is under construction, additional information will be provided as it becomes available - thank you for your patience****

Documentation Process 

The following list is provided as a guide to obtain necessary information for initial submission of plans and permit documentation to the Code Administration Permit Center:

  • Building Plan Submission Checklist (see below)
  • 5 plan sets: 
    • Plan size shall not exceed 24” wide x 36” long
    • Dimensioned plans are required, minimum scale 1/8” = 1’0”
    • Plans shall be in permanent ink
    •  Tissue and tracing paper will not be accepted
    • Note: per Virginia’s USBC, One & Two-family dwelling construction permits, including accessory structures, must be completed  within 3 years of permit issuance date
  • Construction Permit Application 
  • Contractor Selection Checklist  or Property Owner’s Affidavit
  • Tree Information Form
  • Noise Ordinance Affidavit
  • Alexandria Soils Policy (refer to policy for proposed project specific requirements)
  • Neighbor Notification Letter (if proposed project is </=  5ft  from the property-line)
  • Rodent Abatement Documentation 
  • Home Improvement License Application Package attached *Required for Class B and Class C contractors* also see The Home Improvement Code Waiver Form 
  • House Location Plat (Planning & Zoning)
  • Floor Area Open Space Calculation Sheet  (Planning & Zoning)
  • A/C Waiver form (if proposed unit is in a required yard)  (Planning & Zoning)

The following documents can be submitted anytime prior to commencement of trade work:

Plan Review Process

Inspection Process

 

Certificate of Occupancy Process