Main content
City of Alexandria Homepage
Wednesday, December 17  •  46°Fair Air Quality: Green
CloseWeather Forecast
Today: High 55° Low 31°
ClearAir Quality: Green
Thu: High 44° Low 30°
SunnyAir Quality: Green
Fri: High 46° Low 29°
SunnyAir Quality: Green
Sat: High 40° Low 32°
Mostly CloudyAir Quality: Green
Sun: High 47° Low 35°
Sunny
City of Alexandria, VA City of Alexandria, VA
Recreation
Share Share RSS RSS Print Print Text Size Text Size NormalText Size LargeText Size Extra Large
Page updated Apr 17, 2014 12:59 AM
CloseComments

No Comments Posted Yet

For Immediate Release: April 17, 2014

Construction Work Scheduled at City of Alexandria Courts

The City of Alexandria’s Department of Recreation, Parks and Cultural Activities is renovating the basketball court at Stevenson Park; the basketball court at Eugene Simpson Stadium Park; the tennis court at Hooffs Run Park and Greenway; and the multi-use court at Mount Jefferson Park. Residents will see equipment in use and crews at work during the daytime. 

  • Stevenson Park, 300 Stultz Rd.
    • Planned Work: the court will be resurfaced and recolored. Please note that the new asphalt must cure for two weeks after installation before new lines and color can be applied.
    • Date of Work: scheduled to take place between April 21 and May 21
  • Mount Jefferson Park, 301 Hume Ave.
    • Planned Work: the court will be resurfaced and recolored. Please note that the new asphalt must cure for two weeks after installation before new lines and color can be applied.
    • Date of Work: scheduled to take place between April 28 and May 28
  • Eugene Simpson Stadium Park, 426 E. Monroe Ave.
    • Planned Work: the court will be resurfaced, recolored, and new goals will be installed. Please note that the new asphalt must cure for two weeks after installation before new lines and color can be applied.
    • Date of Work: scheduled to take place between May 12 and June 12
  • Hooffs Run Park and Greenway, 28A E. Linden St.
    • Planned Work: the court will be resurfaced, recolored, and fencing will be installed. Please note that the new asphalt must cure for two weeks after installation before new lines and color can be applied.
    • Date of Work: scheduled to take place between May 12 and June 12

Signs will be posted onsite with construction information. For your safety, please use extra caution when moving around the site.

For additional information or questions about the work, contact Ty Specht, Construction Manager, at tspecht@programmanagers.com or 202.266.3426.

For additional information on City park improvement activities, call the Department of Recreation, Parks and Cultural Activities at 703.746.4343.
 

1108 Jefferson St.
Alexandria, VA 22314
703.746.4343
Fax: 703.838.6344
E-Mail

Office Hours
Monday-Friday
8 am - 5 pm

James B. Spengler
Director
703.746.5500