Main content
City of Alexandria Homepage
Saturday, August 23  •  73°Cloudy Air Quality: Green
CloseWeather Forecast
Today: High 77° Low 65°
ShowersAir Quality: Green
Sun: High 81° Low 62°
SunnyAir Quality: Green
Mon: High 84° Low 61°
Mostly SunnyAir Quality: Green
Tue: High 85° Low 62°
Sunny
Wed: High 90° Low 65°
Sunny
City of Alexandria, VA City of Alexandria, VA
T&ES
Share Share RSS RSS Print Print Text Size Text Size NormalText Size LargeText Size Extra Large
Page updated Apr 24, 2013 1:40 PM
CloseComments

No Comments Posted Yet

Edsall Road Reconstruction Project:

What's New?

  • Milling and paving on Edsall Road will begin the week of April 29, and is expected to be finished mid-July. This work will take place Monday – Friday from 7 a.m. to 6 p.m., and on Saturday from 9 a.m. to 6 p.m. There may be significant local traffic impacts and motorists are encouraged to use alternate routes. Variable message signs will be posted to alert drivers and provide detour information.

The Edsall Road Reconstruction project consists of reconstructing Edsall Road, from South Whiting Street to the City border with Fairfax County.  The existing pavement, curb, gutter and sidewalks are currently deteriorating, and have required high maintenance over the past ten years, including patching, repairs and replacement of asphalt, curb and gutters, and sidewalks.

This reconstruction project involves milling and removal of existing pavement, and replacing it with a new pavement section; removal and replacement of curb, gutter and sidewalk at some locations. It also provides improved pedestrian access and safety by installing marked pedestrian crosswalks, ADA compliant ramps and pedestrian signals at intersections controlled by traffic lights.
The project will be financed by a State Revenue Sharing program. A State match of  $1,460,904  has been approved for the years 2010 and 2011.

State Project Number: U000-100-R19
UPC: 94853
The project is expected to start in September of 2012, and will last for approximately six months.
A public information meeting was held on March 7, 2012.

Additional Information:

Contact Information:
Tafesse Gyes
Engineering Division
703.746.4051
Tafesse.Gyes@alexandriava.gov 

301 King St., Room 4100
Alexandria, Va 22314
703.746.4025
Fax: 703.519.3356
E-mail

Office Hours:
Monday-Friday
8:00 a.m. - 5:00 p.m.