The City is replacing the existing sanitary sewer within the 500 block of South Lee Street.
Page updated on Oct 16, 2025 at 11:44 AM

Contact

Lindsay Burleigh
Associate Technical Project Manager
Department of Project Implementation
703.746.4699

 

Arbina Shrestha, PE
Sanitary Infrastructure Engineer
Transportation & Environmental Services
703.746.4243

 

MEDIA INQUIRIES

Office of Communications and Community Engagement
newsroom@alexandriava.gov
703.746.3969

 

TRANSLATION SERVICES

Ver esto en español 
ይህንን በአማርኛ ይመልከቱ 
عرض هذا باللغة العربية

If you prefer communication in another language, free interpretation and translation services are available to you, please email 
LanguageAccess@alexandriava.gov or call 703.746.3960.

 

ACCESSIBILITY

For reasonable disability accommodation, contact Lindsay Burleigh at Lindsay Burleigh@alexandriava.gov or call 703.746.4699, Virginia Relay 711.

Share

Bluesky Share on Facebook Share on X Share via Email
Translate icon
Translate icon
XWARNING: You have chosen to translate this page using an automated translation system. This translation has not been reviewed by the City of Alexandria and may contain errors.

Project Summary

Phase: Construction

Status: Pending Close-Out

Location: Old Town

Managing Dept.: Project Implementation

Sponsor Dept.: Transportation & Environmental Services

Map of Alexandria with a red box indicating the location of the the 500 block of South Lee Street in southeastern Old Town.
View in Google Maps

Project Description

The City of Alexandria enhanced the sanitary sewer system along the 500 block of South Lee Street to improve performance and increase capacity. This upgrade addressed recurring sewer backups caused by root intrusion—where tree roots enter and obstruct aging pipes—particularly during heavy rainfall. 

As part of the project, the City replaced outdated 6" & 8" clay and reinforced concrete pipes with approximately 225 linear feet of 10” sanitary sewer pipe.  Six property laterals were reconnected to the new main line. 

A roller vehicle next to a strip of fresh asphalt on the road.
A worker stands next to a strip of fresh asphalt in the road. A turquoise and black sewer pipe awaiting installation are set next to the curb.
A turquoise sewer pipe is set inside a gravel-lined trench cut into the pavement of the road.
of
Grid View Close Modal
A roller vehicle next to a strip of fresh asphalt on the road.
The sewer was installed in the western lane of S Lee Street. The trench was filled with asphalt. City Public Works will repave the street.
A worker stands next to a strip of fresh asphalt in the road. A turquoise and black sewer pipe awaiting installation are set next to the curb.
The sewer project continued halfway up the block, where pipe conditions were prioritized for replacement.
A turquoise sewer pipe is set inside a gravel-lined trench cut into the pavement of the road.
After the old pipe was excavated, the new turquoise SDR pipe was installed and each home was reconnected to the main line, flowing to the existing sewer at Wilkes St.

Funding

Project Budget: $380,000

CIP Section: Sanitary Sewer

Learn more about the City of Alexandria's Fiscal Year Budget.

Schedule

  • Planning: March 2023 - September 2023
  • Design: September 2023 - December 2024
  • Construction*: December 2024 - December 2025
*Note: Construction phase includes four to six months for procurement, plus site work and close-out activities.

Construction

Construction Update

Project construction is complete. City staff have conducted a walkthrough to certify that the repairs were executed as contracted. 

Community Events

The City held a pre-construction meeting the evening of Wednesday, June 25 at Alexandria City Hall.

  • View the Presentation
  • Watch the Video
  • Capital Improvement Program
  • Infrastructure
  • Maintenance
  • Public Facilities
  • Public Works
  • Sewers
Contact Us
Alex311 | 703.746.4311
Follow Us
  • BlueSky
  • Facebook
  • X
  • YouTube
Visitor Information

VisitAlexandriaVA.com

  • Jobs
  • Payments
  • Departments
  • Newsroom
  • Social Media
  • Emergency Hotlines
  • Accessibility
  • FOIA Requests
  • Privacy & Legal

Alexandria City Hall
301 King Street
Alexandria, VA 22314

City of Alexandria Seal
© 1995–2023 City of Alexandria, VA and others.
Hold on, redirecting...