Eisenhower Culvert Improvement Project

Page updated on October 19, 2026 at 4:27 PM

Flood Action Alexandria

  • Flood Action Homepage
  • Community Engagement
  • Flooding & Drainage
  • Flood Mitigation Grant Program
  • Stormwater Management
  • RiverRenew
  • Stormwater Utility Fee
  • Sanitary Sewers

Share

Bluesky Share on Facebook Share on X Share via Email
Translate icon
Translate icon
XWARNING: You have chosen to translate this page using an automated translation system. This translation has not been reviewed by the City of Alexandria and may contain errors.

Current Phase: Design

Sponsor Project Manager: Haweni Gobena, Department of Transportation and Environmental Services

Managing Project Manager: Alex Haptemariam, Department of Project Implementation

Eisenhower Lake Cook
Lake Cook Inverts under Eisenhower Avenue

Project Description

The Eisenhower Culverts Improvement Project aims to address the deterioration of the existing galvanized corrugated metal pipe arches that serve as critical stormwater discharge conduits from Lake Cook to Cameron Run.

The project seeks to repair or replace these culverts to provide reliable drainage, mitigate potential flooding risks, and protect the surrounding environment, including the vegetated outfall buffer near Cameron Run Regional Park. The goal of the project is to enhance the culverts' structural integrity and functionality, supporting long-term stormwater management for the City of Alexandria. 

Progress Update

October 2026

Project Status:
City departments have completed their review of the 100% design plans, cost estimate, and specifications. The comments from the City have been provided to the consultant for incorporation into the final documents. The City also applied for a general environmental permit from the U.S. Army Corps of Engineers (USACE). 

Next Steps:
The City is preparing presentation materials for the second public meeting, anticipated to take place at the end of November 2026.

Details about the meeting, including the date, time, and location, will be shared once they are finalized.

The City will continue to provide updates as the design and review process progresses. 

Project Funding

Total Project Budget: $2,126,386

Planning: $50,600

Design: $345,513

Construction: $1,730,273

Project Schedule

Planning: January 2024 - Fall 2025

Design: Summer 2026 - Summer 2027

Construction: Fall 2027 - Fall 2028

Project schedules are subject to change as design, review, permitting, and construction planning progress. 

Planning Phase

The City of Alexandria plans to repair the existing galvanized corrugated metal pipe arches at the Eisenhower culverts, which serve as discharge point for Lake Cook, allowing water to flow under Eisenhower Avenue into Cameron Run. These culverts are situated between Eisenhower Avenue and Lake Cook, near Cameron Run Regional Park.

The culverts are in poor condition, particularly at the pipe wall-invert interface. Severe corrosion, section loss, scouring, and undermining have been observed, with significant deterioration at the outfall. Additionally, debris buildup, vegetation, and sediment are obstructing the inlet, whole asphalt lining failures, cracks, exposed metal, and gaps between pipe sections further compromise the structure. 

To address these concerns, the City has approved a proposal for a structural consultant to conduct a structural assessment (SCA) for the Eisenhower Culverts Improvement Project. The assessment will evaluate the overall condition, identify deficiencies, and provide recommendations for maintenance, repairs, or replacement. The project will be funded through the Stream and Channel Maintenance Program. 

On May 15, 2025, the City held a public meeting to present the project. Notices were sent to 227 nearby residents and HOAs.

Future outreach will be shared in advance. 

Contact Us
Alex311 | 703.746.4311
Follow Us
  • BlueSky
  • Facebook
  • X
  • YouTube
Visitor Information

VisitAlexandriaVA.com

  • Jobs
  • Payments
  • Departments
  • Newsroom
  • Social Media
  • Emergency Hotlines
  • Accessibility
  • FOIA Requests
  • Privacy & Legal
City of Alexandria Seal
© 1995–2023 City of Alexandria, VA and others.
Hold on, redirecting...