Bellefonte Avenue Storm Drain Improvements

The City is planning storm sewer improvements for East Bellefonte Avenue and East Howell Avenue to mitigate neighborhood flooding from intense rain events.
Page updated on Nov 21, 2025 at 4:54 PM

Contact

Wael Eltayeb
Technical Project Manager 
Department of Project Implementation 
703.746.4217

Brian Rahal
Civil Engineer IV / Section Lead
Department of Transportation & Environmental Services 
703.746.4057
 

Media Inquiries

Office of Communications and Community Engagement
newsroom@alexandriava.gov
703.746.3969

 

TRANSLATION SERVICES

Ver esto en español 
ይህንን በአማርኛ ይመልከቱ 
عرض هذا باللغة العربية

If you prefer communication in another language, free interpretation and translation services are available to you, please email 
LanguageAccess@alexandriava.gov or call 703.746.3960.

 

Accessibility

For reasonable disability accommodation, contact Wael Eltayeb at Wael.Eltayeb@alexandriava.gov or call 703.746.4217, Virginia Relay 711.

Share

Bluesky Share on Facebook Share on X Share via Email
Translate icon
Translate icon
XWARNING: You have chosen to translate this page using an automated translation system. This translation has not been reviewed by the City of Alexandria and may contain errors.

Project Summary

Phase: Design

Status: Active

Location: Potomac West

Managing Dept.: Project Implementation

Sponsor Dept.: Transportation & Environmental Services

 

Map of Alexandria with red box indicating the location of Bellefonte Avenue.
View in Google Maps

Project Description

The Bellefonte Avenue Storm Drain Improvement project will reduce flood risk for homes within East Bellefonte Avenue, East Howell Avenue, and Clyde Avenue by improving the local drainage system. The project consists of upsizing and relocating the storm pipe currently beneath homes between East Howell Avenue and East Bellefonte Avenue to the right-of-way along the gravel alleyway. Additionally, the existing inlets will be replaced by larger ones to provide greater capacity at the E Bellefonte Avenue low spots. The work will also consider realigning storm drains where necessary. 

 

Progress update

November 2025

Stormwater Improvements on Bellefonte & Howell Avenues

The City completed a review of the 30% design plans and issued comments in late September. A geotechnical investigation is planned to locate subsurface gas lines within the work area.

A test pitting operation using a mechanized drilling rig was completed in early November along East Howell Avenue and East Bellefonte Avenue.

During the design review, the City identified utility conflicts and directed our design consultant to coordinate with the gas and water utility providers to resolve the conflicts. Additionally, coordination has been held with the City’s sanitary sewer team to find a solution to the sewer pipe in the alleyway. Finally, the City is also coordinating with Dominion Energy to relocate a utility pole in the alleyway.  

Looking ahead, the City will host a first community meeting following the completion of the 30% design on December 8, 2025, at the Mount Vernon Recreation Center, 2701 Commonwealth Avenue, starting at 7 p.m. During the meeting, the City will:

  • Share updates on project progress
  • Highlight possible impacts to the neighborhood
  • Invite resident feedback on the proposed design

The meeting will be held both in person and online using Zoom. Prior registration is required for online using the link below:  

https://zoom.us/webinar/register/WN_uDCTcBoGQoCejzr_4lE6OA

Stay tuned for future updates and opportunities to get involved in the conversation! 

Storm Sewer Installation
of
Grid View Close Modal
Storm Sewer Installation
The project will require the installation of large concrete pipes in the bottom of trenches. The trenches will be backfilled and paved over once the pipe installation is complete.

Funding

Project Budget: $1,560,000

Funding Source: Stormwater Utility Fee

CIP Section: Stormwater Management 

Learn more about the City of Alexandria's Fiscal Year Budget.

Schedule

  • Design procurement: September 2024
  • Design start: April 2025
  • Construction procurement: April 2026
  • Construction start: August 2025
  • Complete by: September 2027 

Project Phases

Project Background

The City has been experiencing widespread flooding due to an increase in high-intensity rainfall events, which are attributed to climate change. As a result, residents of Bellefonte Avenue have been facing frequent localized flooding. Several residents have reported in-home flooding because the current curb inlets are unable to capture the excess water. These frequent flooding incidents support the findings from the City of Alexandria’s Storm Sewer Capacity Analysis (CASSCA). This increased flooding is attributed to old infrastructure, the design criteria in place at the time of construction, and the impact from climate change.

Planning

The Bellefonte Avenue Storm Drain Improvement project planning phase is complete. The investigation of neighborhood flooding study is now available, which includes site evaluation, CCTV inspection, hydraulic modeling verification, solution development and cost estimates. The project will be in the design and construction phases once the project budget is available. The estimated timeline for design is FY2025 and for construction FY2026.

Design

The investigation of the Bellefonte Avenue neighborhood flooding Study is complete, and the project is currently in the design stage. The City is in the process of procuring a design contractor to produce the construction drawings. Upon awarding a contract to a design firm, the City plans to meet with residents and stakeholders. Notices will be distributed to residents before the start of work.

Contacts

For the community:  

Wael Eltayeb, P.E.  

Project Manager 

703.746.4217 (Office) 

703.512.6253 (Direct) 

Wael.eltayeb@alexandriava.gov  

  • Capital Improvement Program
  • Flooding
  • Infrastructure
  • Public Facilities
  • Sewers
  • Stormwater
  • Water
Contact Us
Alex311 | 703.746.4311
Follow Us
  • BlueSky
  • Facebook
  • X
  • YouTube
Visitor Information

VisitAlexandriaVA.com

  • Jobs
  • Payments
  • Departments
  • Newsroom
  • Social Media
  • Emergency Hotlines
  • Accessibility
  • FOIA Requests
  • Privacy & Legal

Alexandria City Hall
301 King Street
Alexandria, VA 22314

City of Alexandria Seal
© 1995–2023 City of Alexandria, VA and others.
Hold on, redirecting...