400 Block of Wolfe Street Sanitary Sewer Upsizing Project
Project Summary
Phase: Construction
Status: Construction
Location: Old Town
Managing Department: Project Implementation
Sponsor Department: Transportation & Environmental Services
Project Description
As part of the City's commitment to reducing the likelihood of sewer backups in its sanitary and combined sewer service areas during periods of significant rainfall, the 400 block of Wolfe Street was identified as an area of the combined sewer system experiencing wet weather-related backups in recent years.
This project aims to improve the function and capacity of the existing sewer system along the 400 block of Wolfe Street by upsizing the sanitary sewers in the immediate area of sewer backups.
The sewer upsizing design will be implemented to upsize approximately 430 linear feet of pipe, add three new manholes and will meet the City's minimum design standards for a combined sewer system.
Project Funding
Project Budget: $673,000
CIP Section: Sanitary Sewers
Learn more about the City of Alexandria's Fiscal Year Budget.
Schedule
Design: January 2024 - March 2025
Construction: April 2025 - December 2026
- Site Activity: January 2026 - July 2026
*Note: Construction phase includes four to six months for procurement, plus site work and close-out activities.
Planning Phase
Planning Overview
For years, T&ES has been tracking and monitoring sewer backups that occur throughout the City, and is systematically addressing areas subject to sewer backups that occur as a result of significant wet weather events.
The 400 block of Wolfe Street was identified as an area for future capacity improvement based on a combination of the City's tracking and monitoring, along with reaching out to City staff.
Planning for the 400 Block of Wolfe Street Sewer Upsizing Project was initiated and completed in the fall of 2023. Planning phase activities included CCTV sewer investigations, historic record document review, and public outreach with residents to confirm sewer backups were the result of capacity issues in the isolated section of the combined sewer system. It was determined further field survey and design would be necessary to provide a preliminary solution.
Planning Public Outreach
Public outreach in the planning phase occurred during the fourth quarter of 2023 and focused on direct communication with residents affected by sewer backups along the 400 block of Wolfe Street. Direct correspondence with residents resulted in a site visit and preliminary investigation of affected properties in the proposed project area.
City staff and engineering consultants spoke one-on-one with residents at their homes to discuss exactly when and how often backups occur and provided a general project timeline of design and potential construction in the future.
Design Phase
Design Overview
The 400 Block of Wolfe Street Sewer Upsizing Project is currently in the design phase, which consists of City staff and engineering consultants performing site investigations, including easement surveys, sewer dye-testing, geotechnical borings to determine soil conditions, test holes to locate other utilities, and site survey to obtain information for existing sewer structures in the project area.
Following site investigation activities, engineers will perform sewer capacity calculations to determine how the sewer system currently performs during wet weather events, and prepare sewer system design alternatives to increase the sewer capacity and reduce sewer backups along Wolfe Street.
Design Public Outreach
Public outreach in the design phase consists of notifying residents of ongoing site investigation activities with letters and public notices. City engineers are also accessible for direct communication by phone and email.
For more information, contact:
City Project Manager
Alicia Grant
alicia.grant@alexandriava.gov
703.746.4029
Construction Phase
Community Events
The City held a pre-construction meeting the evening of Thursday, November 13, 2025 at Alexandria City Hall.
More Information
Contact
Lindsay Burleigh, Associate Technical Project Manager
Department of Project Implementation
703.746.4699
Lu Zhang, Civil Engineer IV,
Department of Transportation and Environmental Services
703.746.4289
Media Inquiries
Office of Communications and Community Engagement
newsroom@alexandriava.gov
703.746.3969
Translation Services
Ver esto en español
ይህንን በአማርኛ ይመልከቱ
عرض هذا باللغة العربية
If you prefer communication in another language, free interpretation and translation services are available to you, please email LanguageAccess@alexandriava.gov or call 703.746.3960.