Skyhill Road Stormdrain Extension

The City is extending the storm sewer system serving Skyhill Rd. to improve drainage during wet weather events.
Page updated on Aug 20, 2026 at 10:02 AM

Contact

Mujeeb Rahman Atefi
Sponsor Project Manager
Department of Transportation & Environmental Services 
703.967.8325 

Jonathan Whiteleather 
Managing Project Manager 
Department of Transportation & Environmental Services 
703.746.4637 

 

Media Inquiries

Ursula Ramos
Senior Communications Officer
Department of Transportation & Environmental Services
703.407.0108

 

TRANSLATION SERVICES

Ver esto en español 
ይህንን በአማርኛ ይመልከቱ 
عرض هذا باللغة العربية

If you prefer communication in another language, free interpretation and translation services are available to you, please email 
LanguageAccess@alexandriava.gov or call 703.746.3960.

 

ACCESSIBILITY

For reasonable disability accommodation, contact Camille Liebnitzky at Camille.Liebnitzky@alexandriava.gov or call 703.746.4089, Virginia Relay 711.

Share

Bluesky Share on Facebook Share on X Share via Email
Translate icon
Translate icon
XWARNING: You have chosen to translate this page using an automated translation system. This translation has not been reviewed by the City of Alexandria and may contain errors.

Project Summary

Location: Janney’s Lane / Skyhill Road
Project Number (PMIS): 2308
Project Name: Skyhill Rd. Stormdrain Extension
Current Phase: Planning

Status: Active
Sponsor Project Manager: Mujeeb Rahman Atefi
Managing Project Manager: Jonathan Whiteleather
Sponsor Dept.: Transportation & Environmental Services

Map of Alexandria with a red box indicating the location of the Skyhill Rd. Stormdrain Extension project.
View in our Interactive Map Tool

Project Description

The City of Alexandria is advancing the Skyhill Road Stormdrain Extension Project to improve stormwater collection and reduce localized ponding and drainage concerns along Skyhill Road near Janney’s Lane. The project is in the West Taylor Run neighborhood, along Skyhill Road between the vicinity of 313 Skyhill Road and Janney’s Lane.

During neighborhood investigations and planning-level engineering review, the City identified that stormwater runoff currently travels along the roadway and gutter with limited mid-block inlet capture before reaching the downstream collection point near Janney’s Lane. During larger rainfall events, this can contribute to ponding, bypass flow, and drainage concerns near the downstream end of the corridor.

The proposed project will add targeted storm drain infrastructure along Skyhill Road, including new curb inlets, storm drain pipe connections, and improvements to connect into the existing storm sewer system near Janney’s Lane. During design, the City and its engineering consultant will confirm final inlet locations, pipe sizes, utility conflicts, constructability, right-of-way conditions, and downstream connection requirements.

The project is currently in the planning phase. After planning and internal project review are completed, the project is expected to move into design, followed by construction in a future phase.

Sponsor Program: Flood Action Alexandria / Storm Sewer System Spot Improvements 
Sponsor Program Webpage: Flood Action Alexandria | City of Alexandria, VA

Project Area Map

Project Area Map showing the Skyhill Road Stormdrain Extension project area near Janney's Lane

Description: Map showing the Skyhill Road Stormdrain Extension project area near Janney’s Lane in the West Taylor Run neighborhood.
 

Project Funding

Project Budget

Total Project Budget: Approximately $1.01 M 
Planning: $100K 
Design: $300K 
Construction: Approximately $610K, to be confirmed as the project advances through design 

Funding Breakdown 

Funding is anticipated through the City’s stormwater capital improvement program Flood Action Alexandria. 

Schedule

Schedule 

  • Planning: 2025 to end of 2026 
  • Design: 2026 to end of 2027 
  • Construction: 2027 to 2028 

Planning Phase

Planning Overview

The planning phase includes review of previous neighborhood flooding concerns, field observations, drainage patterns, topographic survey information, and planning-level engineering recommendations for the West Taylor Run neighborhood. The Skyhill Road project was identified as a targeted stormwater improvement to help increase inlet capture and improve conveyance toward the existing storm sewer system near Janney’s Lane.

During the planning phase, the City reviewed existing drainage conditions along Skyhill Road, completed a topographic survey, evaluated stormwater runoff patterns, reviewed planning-level hydrologic and hydraulic information, and developed a drainage improvement concept to increase inlet capture and improve conveyance toward the existing storm sewer system near Janney’s Lane.

The City also updated the planning-level project cost estimate, coordinated internal project delivery needs, and prepared the project for transition into the design phase. The design phase will build on this completed planning work and confirm final inlet locations, pipe sizing, utility constraints, constructability, permitting needs, and construction documents. 

Planning Public outreach

During the planning phase, the City completed neighborhood outreach for residents near the Skyhill Road project area. Outreach included advance notification to nearby residents and an onsite walk-through/site visit to review existing drainage conditions, discuss the planning-level project concept, answer questions, and receive resident feedback.

The site visit provided an opportunity for interested and available residents to meet with City staff, learn about the project status, discuss the City’s planned drainage improvements, and share observations or concerns related to flooding and stormwater runoff in the Skyhill Road area. Feedback received during this outreach will help inform the project as it moves from planning into design. 

PLANNING INITIATIVE/PROCESS

Planning Initiative / Process: Flood Action Alexandria 
Planning Initiative / Process Webpage: Flood Action Alexandria | City of Alexandria, VA

Design Phase

The design phase will refine the planning-level concept into construction-ready documents. This work will include design-level hydrologic and hydraulic analysis, final inlet and pipe sizing, utility investigation, constructability review, cost estimating, permitting review, and preparation of construction drawings and specifications. 

The City will continue coordinating with residents and internal project partners as the design progresses. 

Construction Phase

Construction is anticipated after completion of design, permitting, funding confirmation, and procurement. Construction is expected to include installation of new curb inlets, storm drain pipe connections, roadway and curb restoration, erosion and sediment control measures, and related site work.

More detailed construction information, including schedule, traffic/access impacts, and resident notifications, will be provided as the project moves closer to construction. 

  • Capital Improvement Program
  • Flooding
  • Infrastructure
  • Public Facilities
  • Sewers
  • Stormwater
  • Water
Contact Us
Alex311 | 703.746.4311
Follow Us
  • BlueSky
  • Facebook
  • X
  • YouTube
Visitor Information

VisitAlexandriaVA.com

  • Jobs
  • Payments
  • Departments
  • Newsroom
  • Social Media
  • Emergency Hotlines
  • Accessibility
  • FOIA Requests
  • Privacy & Legal
City of Alexandria Seal
© 1995–2023 City of Alexandria, VA and others.
Hold on, redirecting...