Bridge Inspections and Maintenance

Transportation & Environmental Services (T&ES) is responsible for the inspection and maintenance of 22 roadway bridges and culverts, 5 railroad bridges and 20 pedestrian bridges.
Page updated on April 10, 2026 at 9:44 AM

Public Works

  • Paving & Potholes
    • Report a Pothole
  • Street Sweeping
  • Sewer Maintenance
  • Bridge Maintenance
  • Snow & Ice Control

Share

Bluesky Share on Facebook Share on X Share via Email
Translate icon
Translate icon
XWARNING: You have chosen to translate this page using an automated translation system. This translation has not been reviewed by the City of Alexandria and may contain errors.

Hooff's Run Culvert Maintenance Phase II

The City of Alexandria, Infrastructure Maintenance Division is planning to replace the top section of the Hooff’s Run Culvert located within the park between East Oak and East Walnut Streets to address structural issues identified during recent inspections. In addition, the Recreation, Parks & Cultural Activities (RPCA) department will also make improvements to the park and tennis courts. This project will affect the park and tennis courts, which will have to be closed during the duration of the project, which is tentatively proposed to be for 5-6 months dependent on the weather.  

Work is tentatively scheduled to start in May/June 2026.  The project duration is 5-6 months depending on the weather. 

  • Work hours: Monday-Friday: 7am-6pm; No weekends or Holidays 
  • The park will be closed for the duration of the project. 
  • All work will take place in the park.
  • There may be temporary lane closures for material delivery or removal.
  • Please adhere to No Parking signs in the area.
  • The staging area will be located in the park. 
  • City staff will be on-site to oversee the project 

You may direct questions or concerns to: lisa.jaatinen@alexandriava.gov or https://www.alexandriava.gov/Alex311

Arlington Ridge Road/Mount Vernon Avenue Bridge Reconstruction Project

Arlington County and the City of Alexandria are working as partners on the Arlington Ridge Road/Mount Vernon Avenue Bridge Reconstruction Project.

The project will replace the deteriorated roadway and underlying bridge deck of the bridge between Arlington County and the City of Alexandria. The project will return the bridge to a safe operational condition for all users and improve access for pedestrians and bicyclists.

Construction is underway and starting in mid-November, the southbound lanes on the Arlington Ridge Road/Mount Vernon Avenue bridge will close for approximately 11 months for the first phase of bridge reconstruction, and all traffic will be shifted to the northside (east side) of the bridge.

  • There will be one vehicle lane in each direction, and the east sidewalk will remain open.
  • The Four Mile Run trail underpass on the Arlington County side will close intermittently for a few days at a time during periods of demolition work on the bridge surface; trail users will be able to detour via South Glebe Road and South Lang Street to reconnect with the Four Mile Run Trail.
  • The Four Mile Run Park and shopping center on the City of Alexandria side will be right-in/right-out only in front of the project.

This is the first phase of reconstruction of the bridge, starting with reconstructing the west side of the bridge. After the first half of the bridge is rebuilt, the project will switch all traffic to the rebuilt west half to close and reconstruct the bridge. 

The bridge will continue to operate during construction with reduced lane capacity for vehicular traffic. Pedestrians and bicyclists will continue to have access to the bridge through the project construction.

For more information, visit the Arlington County project page.

VDOT Bridge Information

  • I-395 Express Lanes project and VDOT closures of the Duke Street/I-395 overpass
  • Bridges and Large Culvert Conditions by VDOT District
  • State of structures and bridges – VDOT’s annual reports
  • Bridges in VA – General overview

Contact Us
Alex311 | 703.746.4311
Follow Us
  • BlueSky
  • Facebook
  • X
  • YouTube
Visitor Information

VisitAlexandriaVA.com

  • Jobs
  • Payments
  • Departments
  • Newsroom
  • Social Media
  • Emergency Hotlines
  • Accessibility
  • FOIA Requests
  • Privacy & Legal
City of Alexandria Seal
© 1995–2023 City of Alexandria, VA and others.
Hold on, redirecting...