Braddock Road Trail Access and Corridor Improvements
Description
The Braddock Road Trail Access and Corridor Improvements project aims to enhance safety and accessibility for all users along Braddock Road between Russell Road and North West Street. It seeks to create a more connected, comfortable, and safe corridor for walking, biking, transit, and driving while improving access to the Braddock Road Metrorail Station, Potomac Yard Trail, and Metro Linear Trail.
Project Area Map
Background
Braddock Road is a key east-west route in Alexandria that links residential areas, businesses, and the Braddock Road Metro station. The nearby Metro Linear and Potomac Yard Trails offer north-south connections for pedestrians and cyclists to King Street and Potomac Yard stations. The corridor's mixed traffic creates safety concerns, particularly during rush hour and at crossings, where different types of travelers interact. Residents have reported issues via Alex311. The 2023 Safe Routes to School Walk Audit at George Washington Middle School recommended safety improvements. VDOT has designated the section between Mount Vernon Avenue and North West Street as a top priority for pedestrian and bicycle safety upgrades statewide.
Timeline
Community Engagement
Status: Active
- Phase One Outreach: March 7 to 21, 2025
- Phase Two Outreach: September 10 to October 5, 2025)
- The City collected community feedback on design options.
- Outreach flyer (large) and flyer (small).
- A summary of feedback is available here.
- An open house was held on September 17 at George Washington Middle School. Nearly 40 residents attended to learn about and provide input on the project.
- Open house flyer.
- The City collected community feedback on design options.
Planning & Concept Design
Status: Active
- Spring / Summer 2025: Develop design options.
- September 2025: Design options posted for comment.
Project Design
Design options for improving safety and accessibility along Braddock Road are available for review. The concepts were developed based on community feedback from March 2025, incorporating analysis of traffic patterns, parking utilization, crash data, and other metrics. These options aim to enhance safety and connectivity for all users while maintaining access to the Braddock Road Metrorail Station, Potomac Yard Trail, and Metro Linear Trail. The City collected community feedback on these design options from September 10 to October 5, 2025.
Watch a short video describing corridor and intersection design options.
Frequently Asked Questions
Why is the City doing this Project?
The corridor's mixed traffic creates safety concerns, particularly during rush hour and at crossings, where different types of travelers interact. Residents have reported safety issues via Alex311. The 2023 Safe Routes to School Walk Audit at George Washington Middle School recommended safety improvements. VDOT has designated the section between Mount Vernon Avenue and North West Street as a top priority for pedestrian and bicycle safety upgrades statewide.
What are the goals of this project?
The project goals include reducing traffic crashes, making it easier to walk, bike, and take the bus, and minimizing impacts to traffic congestion.
What is the project timeline?
The planning and conceptual design phase of this project will take place from Winter 2025 - Winter 2026.
How can I provide input?
There will be multiple opportunities for community members to provide input into this process. To receive project updates, please contact Bryan Hayes, project manager, at bryan.hayes@alexandriava.gov.